RE-2002 rotary evaporator’s rotary bottle maximum capacity is 20L, receiving bottle’s maximum capacity is 10L, rotate speed is 0-140r.p.m, motor power is 180W. RE-2002 rotary evaporator(evaporating bottle volume>10L) is equipped with double condenser(main and vice condenser), which has better condensation effect and higher recovery rate. Because this rotary evaporator works under vacuum condition, and contact segment all adopt high temperature resistance material-high borosilicate glass and PTFE material, it is especially suitable for heat reactive material and material which is corrosive to stainless steel’s concentration, crystallization, separation and solvent recovery.RE-2002 Rotary Evaporator
Product Parts
Intelligent digital display lifting water and oil universal bath, stainless steel one-time forming liner without welding, annular heating tube heating evenly, heating rate is high.Water Bath Borosilicate glass one – time forming high-efficiency serpentine condensing tube,good condensing effect and high recovery.Condenser Tube High quality stainless steel prow, frequency control.Motor Full PTFE discharge valve, no material completely free of pollution.Flange connection
Product Parameters
Basic Parameter
Type
RE-2002
Glass Material
GG-17
Support Material
stainless steel
Shell Material
Antisepsis Plastic Spraying 630*534*638 mm
Inner Container Material
stainless steel 450*250 mm
Baseboard Size
534*504 mm
Volume of Rotary Bottle
20L ¢95 flange aperture
Volume of Recycling Bottle
10L ¢60 flange aperture
Vacuum Degree
0.098Mpa
Rotating Power
120W
Rotating Speed
0-110rpm
Heating Power
5KW
Temperature Control Range of Bath Kettle
400℃
Temperature Accuracy
±1℃
Voltage/Frequency (V/Hz)
220V/50Hz
Up and Down Distance
180mm
Shape Size(mm*mm*mm)
1170*540*2200 mm
Package Weight (KG)
123
Function Allocation
Speed Adjustment Mode
Electrodeless Speed Regulation
Rotating Speed Display Mode
Digital Display
Temperature Display Mode
Digital Display K Type Sensor
Temperature Control Mode
Smart Temperature Control
Sealing Mode
PTFE Sealing
Condenser
Vertical efficient condenser, main condenser 130*680, assistant condenser 160*530
Up and Down Mode
Manual Up and Down of Main Engine
Continuous Charging
29# Standard Aperture Feeding Valve
Vacuum Display Mode
Vacuum Meter
Continuous Collecting
Check valve control
Charging Mode
PTFE Charging valve, ¢60 flange aperture
Optional Equipping
Up and Down Mode
Automatic Up and Down
Collecting Device
Double Recycling bottle
Anti-explosion
Anti-explosion Frequency Changer, Anti-explosion Dynamo EX120W
Frame Part
Plastic Spraying or PTFE Spraying
Bath Kettle Material
whole 304 stainless steel
Our company’s laboratory glass and laboratory instruments are independent research and development, available for custom-made according to client requirements.
Packing List
Machine Part
Glass Part
Nose
1 set
Rotary bottle
1 unit
Floor shelf
1 set
Recycling bottle
1 unit
Aluminum Backing Ring of Assistant Condenser
1 unit
Main condenser
1 unit
Vacuum meter
1 pc
Air conduction bottle/td>1 unit
Rotary nut
1 set
Feeding Valve
1 unit
Assistant condenser nut
1 set
¢60 flange tap
1 unit
PTFE sealed joint sleeve
1 set
24# vent valve
2 units
PTFE feeding valve with flange plate
1 set
19# vent valve
1 unit
Check valve
1 set
Rotary shaft
1 unit
Aluminum Backing Ring of recycling bottle
1 unit
Assistant Condenser
1 unit
¢60F4 pad
3 units
¢80F4 pad
1 unit
br>
Big black hat
3.5 sets
Transducer
1 set
Water bath kettle
1 unit
Condenser pipe clamp
1 unit
The final interpretation of this operation manual is reserved by our company. If any change in product, please be subject to the real product. The operation manual will not be changed.
Provide detailed product performance specification;
According to product’s using condition, technicians will offer rationalization proposals to assist clients to select proper product types;
Provide other corollary equipment according to client requirements.
In-Sale Service
With supervision from the source of products, the qualified rate of raw materials entering the factory can reach 100%;
Whole manufacturing process are in strict accordance with promised procedure requirements, product qualified rate can reach100%;
Provide product’s inspection record of key junctures to customers;
Provide production schedule photos to customers at regular intervals;
Package and transport of products are in strictaccordance with the export standard;
Provide transportation schedule information to clients timely.
After-Sale Service
Provide targeted installation video;
Under the premise of correct installation, normal maintenance and using, we guarantee one-year warranty period;
When warranty period has expired, our sold products enjoys lifetime guarantee repair, we only charge cost price for changing product’s standard component and sealing component;
During installation and adjustment period, our after-sale service staff will communicate with customers frequently to know product’s running state in time. Assist customers to install and adjust products until customers are satisfied;
If product has malfunction during operation period, we’ll offer you satisfied answer in time. We’ll reply you within 1 hour and provide solution or send staff to spot within 24 hours after receiving maintenance notification;
Lifelong free technical support. Conduct satisfaction survey and inquiry equipment running condition to clients by telephone or e-mail semiannually from the first day of equipment running, put on records of acquired information;
Provide assistance in solving problems such as equipment damage in the transport.